Here you can see some snapshots of the building process - December 2010 until March 2011. Thanks to a fantastic crew of contractors it was a pleasure to see our project grow every day. We enjoyed this process very much!
Click to enlarge picture.
area where the turnouts will be
Our Facility will feature:
- cinder block barn with 8 horse 'suites'
- large stalls with runs and european stall fronts
- two covered hot water wash racks/grooming places
- non-slip rubber bricks in barn aisle and wash racks
- security cameras
- two dressage rings (one covered)
- round pen
- two large turnouts with shelter and automatic waterer
area where the barn will be
dressage ring is up - December 2010
trench digging for electricity
foundation lines for walls and porch
grundsteinlegung mit niko ...
block work half way done at christmas 2010
well, 25 gmp of yummi water
© High Mountain Dressage • 2012
roof frame end of January
last roof panel gets put on